What you get · Stage 2 of 7 · Contract
Their contract, their words. What am I signing?
Main contractor contracts in plain English. Every clause that bites, what it means for you, and the date it bites by, before you put a price on it.
What you get
From their contract to what you are signing up to, in plain English.
What you're committing to
The ten duties that bite come first, ranked by what missing one could cost you: anything that can lose you the right altogether, then money held back, then damages. Each says who does what, by when and what happens if you don't, cited to its clause and shown as found until you accept it, with everything else in the contract kept behind it.
Standard or not, and what may bite
You get the contract form named and the changes their amendments and contract particulars make to it, listed. Each risk is flagged with its size and cited to the page as a risk in our opinion: take advice. You decide each one: qualify it, price it in, or hold it for advice.
On the job, the days left
Win it, and the same duties come across to the job. Say a delay into the diary on site, or log an instruction, and it shows against its duty with the days left to tell them. The notice is drafted, and goes only when you say yes.
The claims guide
What helps if a job ends in a row over money or time, in site words: write it down on the day, no paper no pay, miss the deadline and lose the money. Each piece points at the record in your job that proves it. It is not legal advice, and it says so.
What it hands on
The duties you accepted at tender come across to the job word for word. Win it, and the order is checked against the tender you sent before you accept it.